Bathroom Renovations in Manhattan
Custom Bathroom Renovations
RemodelNY renovates bathrooms in Manhattan co-ops, condos, and townhomes. We plan the room around how you use it and coordinate the build from protection and demolition through the final walkthrough.
Bathroom Layouts and Walk-In Showers
Keeping the vanity, toilet, and bathing area on their existing plumbing can simplify the work when the room already has good clearances. If a door hits the vanity or the tub crowds the entrance, we look at what a different footprint can gain before committing to moving pipes.
For a tub-to-shower conversion, we review the existing drain location, floor depth, building rules, and the space the glass needs to open. We plan the controls, niche, and threshold together so the finished shower is easy to enter and use.


Renovating in a Manhattan Co-op or Condo
We review your alteration agreement where applicable and coordinate with management on the scope, documentation, and access. We plan around permitted work hours, elevator bookings, deliveries, debris removal, and water shutoffs. If a proposed change requires drawings, filings, or additional review, we identify what needs to happen with the appropriate professionals before scheduling that work.
Vanities, Storage, and Mirror Lighting
A shallower vanity can open up the passage through a narrow bathroom. Drawers keep everyday items within reach, and a recessed medicine cabinet or shower niche can put storage into the wall when the framing and plumbing allow it. We coordinate lighting at the mirror with the cabinet depth and door swing, then review shower lighting, ventilation, and fixture finishes as part of the same plan.
Project Spotlight | Midtown Classic
The owners of this Midtown pied-à-terre wanted a quiet retreat as they planned for retirement. The apartment started in estate condition. The renovation carried a traditional palette through the home, and the finished bathroom pairs a wood vanity and pale surfaces with a mosaic tile band, glass enclosure, and window light.
Our Process
What Drives Cost and Schedule?
-
Moving plumbing, repairing conditions discovered during demolition, and specifying custom cabinetry, stone, or glass can increase the scope. Building review and access windows affect the schedule, as do material lead times. We discuss those dependencies during planning so you can decide what to prioritize before ordering or scheduling work.
From Site Protection to Final Walkthrough
-
Protect and remove. We review the route from the building entrance to the apartment and protect the work area and affected paths. Once demolition exposes the walls and floor, we check the conditions that can affect the planned work.
-
Coordinate the trades. We confirm clearances and coordinate plumbing, electrical, and ventilation with licensed trades where applicable before the walls close.
-
Waterproof, tile, and finish. We sequence the shower waterproofing and drainage before tile, then lay out the tile around corners, the niche, and transitions. We install the vanity, fixtures, lighting, glass, and hardware in the order the room calls for.
-
Walk the room together. At the final walkthrough we review how fixtures, cabinet doors, drawers, and shower glass operate and record any final adjustments.
Questions Before You Start
-
What if it’s our only bathroom? Tell us early. We discuss when the toilet, shower, and sink are expected to be out of service so you can plan for alternative access or a temporary stay if needed.
-
What should I bring to the first consultation? Current photos, a floor plan if available, your priorities, a working budget, and preferred timing. Share your building’s alteration package if you have it.
-
Schedule a Bathroom Consultation
